Lukoil PLATFORM D33

Scope of Works: Prefabrication of the Cellar Deck for the Topside platform of Lukoil D33 (Baltic Sea)
Prefabrication

Customer

ROSETTI MARINO / LUKOIL

Location

ROSETTI MARINO PIOMBONI YARD, RAVENNA

Date

December 2021 – February 2022

Scope

Prefabrication of the Cellar Deck for the Topside platform of Lukoil D33 (Baltic Sea)

Project information

Main activities:

  • Procurement: consumables and work equipment
  • Vehicles: for lifting and handling
  • Construction: prefabrication and assembly

Materials Statistics:

  • Total structural steel: 150 ton
  • Dimensions: 15 x 15 m

Labor Statistics:

  • Total man hours: 11,000 hours
  • Peak manpower: 40 pax